[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51937":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},51937,53,1,"单选题","关于建设工程施工图设计文件审查的说法，错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工图设计文件未经审查批准的，不得使用",false,{"key":16,"text":17,"correct":14},"B","施工图审查应当坚持先勘察、后设计的原则",{"key":19,"text":20,"correct":14},"C","施工图设计文件审查是为了加强对房屋建筑工程、市政基础设施工程施工图设计文件审查的管理，提高工程勘察设计质量",{"key":22,"text":23,"correct":24},"D","施工图设计文件审查的内容仅限于涉及工程的公共利益和公共安全",true,"D项，施工图设计文件审查是指施工图审查机构按照有关法律、法规，对施工图涉及公共利益、公众安全和工程建设强制性标准的内容进行的审查。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]