[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51856":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},51856,53,1,"单选题","建筑产品的（ ）特点决定了每项工程都必须单独计算造价。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单件性",true,{"key":16,"text":17,"correct":18},"B","多次性",false,{"key":20,"text":21,"correct":18},"C","组合性",{"key":23,"text":24,"correct":18},"D","多样性","建筑产品的单件性特点决定了每项工程都必须单独计算造价，不能像一般工业产品那样按品种、规格、质量成批定价。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]