[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51846":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},51846,53,1,"单选题","预测构成工程实体的材料费的依据是材料价格信息、工料分析表和（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","技术措施",true,{"key":16,"text":17,"correct":18},"B","安全措施",false,{"key":20,"text":21,"correct":18},"C","临时设施搭设计划",{"key":23,"text":24,"correct":18},"D","现场平面布置计划","根据工料分析表、技术措施（例如钢筋搭接方式、混凝土配合比、掺合料的应用等），结合市场调研掌握的材料价格信息，预测构成工程实体的材料费。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]