[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51845":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},51845,53,1,"单选题","关于施工成本管理各环节关系的说法，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","成本计划是成本预测的编制基础",false,{"key":16,"text":17,"correct":14},"B","成本计划能对成本控制的实施进行监督",{"key":19,"text":20,"correct":21},"C","成本核算是成本计划是否实现的最后检查",true,{"key":23,"text":24,"correct":14},"D","成本考核为成本分析提供依据","施工成本管理是一个有机联系与相互制约的系统过程，包括：①施工成本预测；②成本计划；③成本控制；④成本核算；⑤成本分析；⑥成本考核等环节。A项，成本预测是成本计划的编制基础，成本计划是开展成本控制和核算的基础。B项，成本控制能对成本计划的实施进行监督，保证成本计划的实现。C项，成本核算又是成本计划是否实现的最后检查，成本核算所提供的成本信息又是成本预测、成本计划、成本控制和成本考核等的依据。D项，成本分析为成本考核提供依据，也为未来的成本预测与成本计划指明方向；成本考核是实现成本目标责任制的保证和手段。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]