[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51842":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},51842,53,1,"单选题","下列成本中，用作工程项目实际成本降低额和实际成本降低率计算基准的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","概算成本",false,{"key":16,"text":17,"correct":18},"B","预算成本",true,{"key":20,"text":21,"correct":14},"C","计划成本",{"key":23,"text":24,"correct":14},"D","实际成本","预算成本与实际成本的差额称为实际成本降低额，实际成本降低额与预算成本的比值称为实际成本降低率。这两项指标都是企业综合收益水平的反映，所以预算成本是工程项目实际成本降低额和实际成本降低率的计算基准。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]