[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51826":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},51826,53,1,"单选题","分项工程项目清单的项目名称一般以（ ）命名。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目特征",false,{"key":16,"text":17,"correct":14},"B","项目量纲",{"key":19,"text":20,"correct":14},"C","项目编码",{"key":22,"text":23,"correct":24},"D","工程实体",true,"分部分项工程量清单的项目名称应按相关工程计价规范附录中列出的项目名称，结合拟建工程实际确定。分部分项工程项目清单的项目名称一般以工程实体命名，项目名称如有缺项，编制人应作补充，并报省级或行业工程造价管理机构备案。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]