[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51820":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},51820,53,1,"单选题","对于国有资金投资的发承包项目，工程款拨付和最终结算的依据之一是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程量清单",true,{"key":16,"text":17,"correct":18},"B","预算定额",false,{"key":20,"text":21,"correct":18},"C","施工定额",{"key":23,"text":24,"correct":18},"D","概算定额","工程量清单为工程款拨付和最终结算提供了直接依据。工程实施过程中，发包人根据承包人完成工程量清单规定内容的情况，以投标时在工程最清单中所报单价作为支付工程进度款和进行结算的依据。依照《建设工程工程量清单计价规范》规定，使用国有资金投资的建设工程发承包，必须采用工程量清单计价。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]