[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51760":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},51760,53,1,"单选题","关于建设工程施工图设计文件审查的说法，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工图设计文件由建设单位进行审查",false,{"key":16,"text":17,"correct":14},"B","施工图设计文件由勘察设计企业招标确定的审查机构进行审查",{"key":19,"text":20,"correct":21},"C","施工图审查应当坚持先勘察、后设计的原则",true,{"key":23,"text":24,"correct":14},"D","施工图设计文件审查的内容仅限于是否符合工程建设强制性标准","建设工程施工图设计文件审查规定包括：①建设单位应当将施工图送审查机构审查，但审查机构不得与所审查项目的建设单位、勘察设计企业有隶属关系或者其他利害关系。故AB两项错误。②施工图设计文件审查是指施工图审查机构按照有关法律、法规，对施工图涉及公共利益、公众安全和工程建设强制性标准的内容进行的审查。施工图审查应当坚持先勘察、后设计的原则。故C项正确。③施工图审查机构对施工图审查的内容包括：是否符合工程建设强制性标准；地基基础和主体结构的安全性；消防安全性；人防工程（不含人防指挥工程）防护安全性；等等。故D项错误。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]