[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51759":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},51759,53,1,"单选题","工程质量管理体系运行的有效管理方法是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","检查与考核",false,{"key":16,"text":17,"correct":14},"B","审核与评估",{"key":19,"text":20,"correct":21},"C","PDCA循环",true,{"key":23,"text":24,"correct":14},"D","QCDS控制","质量管理体系重视过程质量控制，认为“持续改进”在质量管理中处于核心地位。因此，PDCA循环是质量管理体系运行的有效管理方法。PDCA循环具有互相衔接、互相促进、螺旋式上升、不断推进等特点。质量保证体系的运行就是按照PDCA循环周而复始地运转，从而保证和提高工程质量。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]