[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51693":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},51693,53,1,"单选题","关于工程项目目标控制措施的说法，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主要有组织措施、技术措施、合同措施和经济措施",false,{"key":16,"text":17,"correct":18},"B","经济措施是实施其他各类措施的前提和保障",true,{"key":20,"text":21,"correct":14},"C","审核工程量、工程款支付申请及工程结算报告属于经济措施",{"key":23,"text":24,"correct":14},"D","对施工组织设计、施工方案等进行审查、论证属于技术措施","B项，工程项目目标控制措施包括组织措施、技术措施、经济措施和合同措施。其中，组织措施是实施其他各类措施的前提和保障。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]