[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51545":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},51545,53,1,"单选题","下列关于施工建设阶段的说法错误的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","配合设备安装、确保安装质量属于介入的内容。",false,{"key":16,"text":17,"correct":18},"B","熟悉并记录基础及隐蔽工程，无需注意设计资料中未反应的内容。",true,{"key":20,"text":21,"correct":14},"C","应做好现场记录。",{"key":23,"text":24,"correct":14},"D","要注意介入的方式方法，既要对质量持认真态度又不要对正常的施工、建立工作造成影响。","根据施工建设阶段内容及接入的方法和要点可以判断B选项错误。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]