[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51344":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},51344,53,1,"单选题","项目控制与监理是房地产开发过程（）阶段的工作。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","投资决策",false,{"key":16,"text":17,"correct":14},"B","前期准备",{"key":19,"text":20,"correct":21},"C","工程建设",true,{"key":23,"text":24,"correct":14},"D","市场营销","房地产开发建设阶段是将前期阶段的各项方案和计划以及项目开发过程中所涉及的人力、材料、机械设备、资金等资源集中于开发地块上和特定的时间段上，进行正式施工建设的活动。这一阶段的工作任务主要是进行项目施工建设管理、项目控制、工程监理、项目竣工验收和交付使用。@##",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]