[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51343":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},51343,53,1,"单选题","关于工程竣工验收和交付使用的说法错误的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工验收是施工过程的最后一道程序",false,{"key":16,"text":17,"correct":18},"B","房地产开发主管部门应当自收到竣工验收申请之日起20日内，对设计公共安全的内容进行验收。",true,{"key":20,"text":21,"correct":14},"C","开发项目竣工验收，除了对主体工程检查验收外，还应进行对附属工程及室外工程的检查验收",{"key":23,"text":24,"correct":14},"D","经验收合格的项目即可办理交付使用户手续。","房地产开发主管部门应当自收到竣工验收申请之日起30日内，对涉及公共安全的内容，组织工程质量监督、规划、消防、人防等有关部门或者单位进行验收。 @##",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]