[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-51017":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},51017,53,1,"单选题","核算月度成本时，对由当期工程成本承担而尚未支付的材料费应（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","在支付后计入成本",false,{"key":16,"text":17,"correct":14},"B","在当期部分计入工程成本",{"key":19,"text":20,"correct":14},"C","在成本中摊销",{"key":22,"text":23,"correct":24},"D","在当期全部计入工程成本",true,"考核工程成本核算的要求，要正确划分各种成本费用的界限包括四个方面，其中有本期工程费用和不属于本期工程成本的界限。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]