[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50998":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},50998,53,1,"单选题","通过分部分项工程实际消耗与预算计划的对比，可以（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","计算该分部分项工程的实际成本",false,{"key":16,"text":17,"correct":14},"B","调整该分部分项工程的成本计划",{"key":19,"text":20,"correct":14},"C","把实际消耗控制在预算计划之内",{"key":22,"text":23,"correct":24},"D","发现成本费用偏差和偏差的原因",true,"考核工程成本控制的方法--以成本计划控制工程项目施工成本支出",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]