[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50976":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},50976,53,1,"单选题","落实成本责任的首要前提是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","科学地预测实际成本",false,{"key":16,"text":17,"correct":14},"B","切实做好成本分析",{"key":19,"text":20,"correct":21},"C","科学地编制计划成本",true,{"key":23,"text":24,"correct":14},"D","提高全员成本意识","工程成本预测与计划是落实成本责任制的依据。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]