[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50971":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},50971,53,1,"单选题","按成本的经济性质，工程成本由( )组成。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","变动成本和固定成本",false,{"key":16,"text":17,"correct":14},"B","制造成本和完全成本",{"key":19,"text":20,"correct":21},"C","直接成本和间接成本",true,{"key":23,"text":24,"correct":14},"D","预算成本和实际成本","按成本的经济性质，现行施工企业财务制度规定的核算科目，工程成本由直接成本和间接成本组成。直接成本是指施工过程中直接耗费的构成工程实体或有助于工程形成的各项支出；间接成本是指企业的各施工单位（项目部、分公司、工程处）为施工准备、组织和管理施工生产所发生的全部施工间接费支出。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]