[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50946":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},50946,53,1,"单选题","某施工队在200个工日内完成了800立方米的工程，但有400立方米不符合质量要求。 根据所学知识，回答问题。 上述施工队的时间定额为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0.25工日\u002F立方米",false,{"key":16,"text":17,"correct":18},"B","0.5工日\u002F立方米",true,{"key":20,"text":21,"correct":14},"C","2工日\u002F立方米",{"key":23,"text":24,"correct":14},"D","4工日\u002F立方米","时间定额=200\u002F（800-400）=0.5工日\u002F立方米@##",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]