[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50905":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},50905,53,1,"单选题","有效工作时间不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","准备与结束工作时间",false,{"key":16,"text":17,"correct":14},"B","基本工作时间",{"key":19,"text":20,"correct":14},"C","辅助工作时间",{"key":22,"text":23,"correct":24},"D","偶然工作时间",true,"有效工作时间是从生产效果来看与产品生产直接有关的时间消耗。包括基本工作时间、辅助工作时间、准备与结束工作时间。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]