[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50874":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},50874,53,1,"单选题","工程建设定额是指在正常的施工条件下，完成一定计量单位的合格产品所必须消耗的劳动力、材料、机械设备及资金的( )标准。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","数量",true,{"key":16,"text":17,"correct":18},"B","质量",false,{"key":20,"text":21,"correct":18},"C","价格",{"key":23,"text":24,"correct":18},"D","施工","工程建设定额是指在正常的施工条件下，完成一定计量单位的合格产品所必须消耗的劳动力、材料、机械设备及资金的数量标准。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]