[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50819":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},50819,53,1,"单选题","措施费定额属于（ ）定额。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建筑工程",false,{"key":16,"text":17,"correct":14},"B","设备安装工程",{"key":19,"text":20,"correct":21},"C","建筑安装工程费用",true,{"key":23,"text":24,"correct":14},"D","工程建设其他费用","建筑安装工程费用定额包括措施费定额和间接费定额。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]