[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50802":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},50802,53,1,"单选题","某施工队在200个工日内完成了800立方米的工程，但有400立方米不符合质量要求。根据所学知识，回答1-5题。 按现行制度规定，每个工日工作时间是指_______。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","实际工作时间",false,{"key":16,"text":17,"correct":14},"B","要求工作时间",{"key":19,"text":20,"correct":21},"C","8小时",true,{"key":23,"text":24,"correct":14},"D","平均工作时间","时间定额是以工日为单位，每一工日按8小时计算。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]