[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50777":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},50777,53,1,"单选题","对建设规模、投资方案有较大影响的设计变更，须经( )同意。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","原批准初步设计单位",true,{"key":16,"text":17,"correct":18},"B","原施工图审查单位",false,{"key":20,"text":21,"correct":18},"C","原工程招标机构",{"key":23,"text":24,"correct":18},"D","原合同备案机构","考察施工阶段涉及变更的管理。对建设规模、投资方案有较大影响的设计变更，须经原批准初步设计单位同意。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]