[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50671":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},50671,53,1,"单选题","建设工程项目的生产过程通常可以采用不同的施工组织方式，其中有利于资源供应的组织方式是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","依次施工和流水施工",true,{"key":16,"text":17,"correct":18},"B","平行施工和流水施工",false,{"key":20,"text":21,"correct":18},"C","依次施工和平行施工",{"key":23,"text":24,"correct":18},"D","平行施工和搭接施工","依次施工组织方式具有单位时间内投入的资源量较少，有利于资源供应的组织的特点；流水施工组织方式具有单位时间投入的劳动力和机具设备等资源较为均衡，有利于资源供应的组织的特点。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]