[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50427":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},50427,53,1,"单选题","建设单位在编制工程概算时，应确定建设工程()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全生产和文明施工标准",false,{"key":16,"text":17,"correct":18},"B","安全作业环境及安全施工措施所需费用",true,{"key":20,"text":21,"correct":14},"C","安全防护用具和安全防护设施单价",{"key":23,"text":24,"correct":14},"D","安全技术措施和专项施工方案计划","",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]