[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},50257,53,1,"单选题","降低工程项目变动成本的关键是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","降低固定成本的绝对值",false,{"key":16,"text":17,"correct":14},"B","减少施工管理人员",{"key":19,"text":20,"correct":14},"C","增加施工作业人员",{"key":22,"text":23,"correct":24},"D","降低单位分项工程的消耗定额",true,"变动成本是指随着工程量的增减而相应发生增加或减少的费用，降低变动成本的关键是降低单位分项工程的消耗定额。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]