[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50248":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},50248,53,1,"单选题","工程项目成本核算遵循()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","权责发生制",true,{"key":16,"text":17,"correct":18},"B","实际发生制",false,{"key":20,"text":21,"correct":18},"C","收益发生制",{"key":23,"text":24,"correct":18},"D","预算发生制","工程成本核算的原则包括：①项目班子应按照费用归口管理的要求和成本责任的划分；②严格遵守成本开支范围，正确划分工程成本的费用界限，按权责发生制的原则，核算项目工程成本；③正确划分工程成本核算对象，一般应以每个独立编制施工图预算的单位工程为成本核算对象；④必须保证成本核算的真实性和准确性，真实性和准确性是成本核算的生命。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]