[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50219":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},50219,53,1,"单选题","构成工程实体主要材料的成本属于()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","间接成本",false,{"key":16,"text":17,"correct":14},"B","变动成本",{"key":19,"text":20,"correct":14},"C","固定成本",{"key":22,"text":23,"correct":24},"D","直接成本",true,"直接成本包括人工费、材料费、机械使用费和其他直接费。其中材料费是在施工过程中所耗用的能够构成工程实体的各种主要材料、结构件的成本以及不能构成工程实体但有助于工程形成的其他材料，例如周转材料的摊销和租赁费等。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]