[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50136":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},50136,53,1,"单选题","（）的工程建设项目，必须采用工程量清单计价。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","国家重点建设",false,{"key":16,"text":17,"correct":14},"B","利用外国政府或国际组织贷款、援助资金",{"key":19,"text":20,"correct":21},"C","全部使用国有资金投资或国有资金投资为主",true,{"key":23,"text":24,"correct":14},"D","关系社会公共利益、公众安全","全部使用国有资金投资或国有资金投资为主的工程建设项目，必须采用工程量清单计价。非国有资金投资的工程建设项目，可采用工程量清单计价。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]