[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50099":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},50099,53,1,"单选题","承包人向发包人提交的竣工结算款支付申请中，不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","应预留的质量保证金",false,{"key":16,"text":17,"correct":14},"B","累计已实际支付的合同价款",{"key":19,"text":20,"correct":21},"C","累计已抵扣的预付工程量金额",true,{"key":23,"text":24,"correct":14},"D","竣工结算合同价款总额","考查竣工结算款的支付。 竣工结算款支付申请应包括下列内容：竣工结算合同价款总额；累计已实际支付的合同价款；应预留的质量保证金；实际应支付的竣工结算款金额。 ABD选项正确，C为干扰选项。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]