[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50067":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},50067,53,1,"单选题","预算定额人工消耗量中的超运距，指的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预算定额规定运距-劳动定额规定运距",true,{"key":16,"text":17,"correct":18},"B","劳动定额规定运距+场外规定运距",false,{"key":20,"text":21,"correct":18},"C","预算定额规定运距+劳动定额规定运距",{"key":23,"text":24,"correct":18},"D","劳动定额规定运距-场外规定运距","超运距用工是指超过人工定额规定的材料、半成品运距的用工。超运距=预算定额规定的运距-劳动定额规定的运距。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]