[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50066":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},50066,53,1,"单选题","施工劳动定额中未包括的、而在一般正常施工情况下又不可避免的一些零星用工称为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基本用工",false,{"key":16,"text":17,"correct":14},"B","超运距用工",{"key":19,"text":20,"correct":14},"C","辅助用工",{"key":22,"text":23,"correct":24},"D","人工幅度差用工",true,"基本用工是指完成分项工程的主要用工量。超运距用工指超过人工定额规定的材料、半成品运距的用工。辅助用工指材料需要在现场加工的用工。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]