[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-50041":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},50041,53,1,"单选题","预算定额中人工消耗指标包括基本用工和()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","其他用工",true,{"key":16,"text":17,"correct":18},"B","有效用工",false,{"key":20,"text":21,"correct":18},"C","偶然用工",{"key":23,"text":24,"correct":18},"D","多余用工","预算定额中人工消耗指标包括基本用工和其他用工，其他用工包括辅助用工、超运距用工、人工幅度差",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]