[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-49943":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},49943,53,1,"单选题","分项工程验收，应由()组织。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","总监理工程师",false,{"key":16,"text":17,"correct":14},"B","施工单位项目经理",{"key":19,"text":20,"correct":21},"C","监理工程师",true,{"key":23,"text":24,"correct":14},"D","施工单位质量负责人","分项工程验收，应由监理工程师组织。 @##",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]