[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-49850":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},49850,53,1,"单选题","工程竣工验收合格后，应由建设单位将有关报告和文件送建设行政主管部门或其他有关部门( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","审定",false,{"key":16,"text":17,"correct":14},"B","核定",{"key":19,"text":20,"correct":14},"C","审批",{"key":22,"text":23,"correct":24},"D","备案",true,"本题考查的是建设工程竣工验收备案制度。 建设单位完成竣工验收后，应在竣工验收合格之日起的15日内，向工程所在地的县级以上地方人民政府建设行政主管部门备案。 其余选项为混淆选项。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]