[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-49732":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},49732,53,1,"单选题","下列各项措施中，属于工程进度管理的合同措施的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","推行CM承发包模式",true,{"key":16,"text":17,"correct":18},"B","建立工期超前或延误的奖惩制度",false,{"key":20,"text":21,"correct":18},"C","及时办理工程进度款支付手续",{"key":23,"text":24,"correct":18},"D","建立进度信息收集和报告制度","BC属于经济措施；D属于信息管理措施。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)建筑与房地产经济","经济金融",0]