[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-833101":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},833101,521,1,"单选题","下列预算方法中，能够适应多种业务量水平并能克服固定预算缺点的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","弹性预算",true,{"key":16,"text":17,"correct":18},"B","增量预算",false,{"key":20,"text":21,"correct":18},"C","零基预算",{"key":23,"text":24,"correct":18},"D","滚动预算","弹性预算又称动态预算法、变动预算法，是以预算期内可能发生的多种业务水平为基础 ，分别确定多种预算指标的预算编制方法。这种方法是针对固定预算的主要不足设计的 ，其预算编制的依据不是某一固定的业务量，而是一个可预见的业务量范围，具有一定的伸缩性，因而称为 “ 弹性预算” 。",{"id":6,"name":27,"category":28,"favorite":29},"资产评估相关知识","会计财税",0]