[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-833092":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},833092,521,1,"单选题","某企业预算直接人工工时为5万小时，变动成本为50万元，固定成本为30万元，总成本费用为80万元；如果预算直接人工工时达到7万小时，则总成本费用为（ ）万元。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","80",false,{"key":16,"text":17,"correct":14},"B","70",{"key":19,"text":20,"correct":21},"C","100",true,{"key":23,"text":24,"correct":14},"D","110","单位变动成本＝50\u002F5＝10（元\u002F小时），如果直接人工工时为7万小时，则预算总成本费用＝30＋10×7＝100（万元）。",{"id":6,"name":27,"category":28,"favorite":29},"资产评估相关知识","会计财税",0]