[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-832805":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},832805,521,2,"多选题","在建造合同的结果不能可靠估计的情况下，下列表述中正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合同成本全部不能收回的，合同成本在发生时确认为费用，不确认收入",true,{"key":16,"text":17,"correct":18},"B","合同成本全部不能收回的，既不确认费用，也不确认收入",false,{"key":20,"text":21,"correct":18},"C","合同成本全部不能收回的，计提减值损失",{"key":23,"text":24,"correct":14},"D","按能够收回的合同成本金额确认为收入，合同成本在发生当期确认为费用",{"key":26,"text":27,"correct":18},"E","合同成本全部不能收回的，合同成本应在发生时按相同金额同时确认收入和费用","AD","建造合同的结果在资产负债表日不能可靠估计的，应当分别下列情况处理：（1）合同成本能够收回的，合同收入根据能够收回的实际合同成本予以确认，合同成本在其发生的当期确认为合同费用；（2）合同成本不可能收回的，在发生时立即确认为合同费用，不确认合同收入。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估相关知识","会计财税",0]