[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-832255":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},832255,521,2,"多选题","不能全额计提坏账准备的情况包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","一年内的应收账款",true,{"key":16,"text":17,"correct":14},"B","计划进行债务重组的应收账款",{"key":19,"text":20,"correct":14},"C","与关联方发生的应收账款",{"key":22,"text":23,"correct":14},"D","已逾期但无确凿证据证明不能收回的应收账款",{"key":25,"text":26,"correct":27},"E","已逾期但有确凿证据证明已经全额不能收回的应收账款",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"资产评估相关知识","会计财税",0]