[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-830693":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},830693,520,1,"单选题","用成本法评估某项专利，已知在开发过程中发生如下费用:耗费材料20万元，专用设备费10万元，工资费用30万元，咨询鉴定费5万元，管理费5万元，营销费用5万元。该项专利技术的直接成本为（ ）万元",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","75",false,{"key":16,"text":17,"correct":18},"B","65",true,{"key":20,"text":21,"correct":14},"C","c.50",{"key":23,"text":24,"correct":14},"D","20","直接成本一般包括:材料费用、工资费用、专用设备费、资料费、咨询鉴定费、协作费、培训费、差旅费、其他费用;间接成本一般包括:管理费、非专用设备折旧费、应分摊的公共费用及资源费用;故直接成本=20+10+30+5=65(万元)。",{"id":6,"name":27,"category":28,"favorite":29},"资产评估实务二","会计财税",0]