[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-44408":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},44408,52,1,"单选题","（ ）又称调整预算法，是以基期水平为基础，分析预算期业务量水平及有关影响因素的变动情况，通过调整基期项目及数额，编制相关预算的方法。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","固定预算法",false,{"key":16,"text":17,"correct":14},"B","滚动预算法",{"key":19,"text":20,"correct":21},"C","增量预算法",true,{"key":23,"text":24,"correct":14},"D","弹性预算法","本题考查增量预算法的概念。增量预算法又称调整预算法，是以基期水平为基础，分析预算期业务量水平及有关影响因素的变动情况，通过调整基期项目及数额，编制相关预算的方法。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)工商管理","经济金融",0]