[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-44019":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},44019,52,1,"单选题","某零件投产批量为3件，经过5道工序加工，单件每道工序作业时间依次为20分钟、5分钟、20分钟、20分钟、10分钟，在平行移动方式下，每批零件全部生产完成的生产周期是（ ）分钟。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","105",false,{"key":16,"text":17,"correct":18},"B","115",true,{"key":20,"text":21,"correct":14},"C","125",{"key":23,"text":24,"correct":14},"D","145","平行移动方式是指一批零件中的每个零件在上道工序加工完成后，马上移到下道工序去加工，由此形成一批零件中的每个零件在各道工序上平行地进行加工。在平行移动方式下，零件全部生产完成的生产周期的计算公式为： 式中：T平为平行移动方式下零件加工的生产周期；t最长为在各道工序中，单件工时最长的工序的单件工时。所以答案为20+5+20+20+10+（3-1）*20=115（分钟）。",{"id":6,"name":27,"category":28,"favorite":29},"(初级)工商管理","经济金融",0]