[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-827385":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},827385,519,2,"多选题","建设项目管理的三大目标是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建设工期",true,{"key":16,"text":17,"correct":18},"B","生产准备",false,{"key":20,"text":21,"correct":14},"C","工程造价",{"key":23,"text":24,"correct":14},"D","工程质量",{"key":26,"text":27,"correct":18},"E","设备调试","ACD","建设工期同工程造价、工程质量一起被视为建设项目管理的三大目标，作为考核建设项目经济效益和社会效益的重要指标。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估实务一","会计财税",0]