[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-827333":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},827333,519,1,"单选题","采用成本法评估建筑物的重置成本通常是以()为依据的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","该建筑物预算数",false,{"key":16,"text":17,"correct":18},"B","同类建筑物客观合理投入额",true,{"key":20,"text":21,"correct":14},"C","建筑物建安成本",{"key":23,"text":24,"correct":14},"D","建筑物人工费率变化率","重置成本=建安综合造价+前期费用及其他费用+资金成本+合理利润",{"id":6,"name":27,"category":28,"favorite":29},"资产评估实务一","会计财税",0]