[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-827254":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},827254,519,1,"单选题","非竣工或非停工的在建工程其成新率一般为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","85%",false,{"key":16,"text":17,"correct":14},"B","90%",{"key":19,"text":20,"correct":14},"C","95%",{"key":22,"text":23,"correct":24},"D","100%",true,"本题考查的是在建工程评估方法。非竣工或非停工的在建工程其成新率一般为100%。",{"id":6,"name":27,"category":28,"favorite":29},"资产评估实务一","会计财税",0]