[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-827134":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},827134,519,2,"多选题","为了分析设备的时间利用情况，对设备时间的划分包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","日历时间",true,{"key":16,"text":17,"correct":18},"B","休息时间",false,{"key":20,"text":21,"correct":14},"C","制度时间",{"key":23,"text":24,"correct":14},"D","计划工作时间",{"key":26,"text":27,"correct":14},"E","实际工作时间","ACDE","设备时间的利用好坏将直接影响生产能力的发挥，从而影响设备的效率。为了分析设备的时间利用情况，可对设备时间做如下划分:日历时间、制度时间、计划工作时间、实际工作时间。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估实务一","会计财税",0]