[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-827064":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},827064,519,2,"多选题","评估机器设备时，自制非标准设备的本体的重置成本通常包含()等。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","材料费",true,{"key":16,"text":17,"correct":14},"B","燃料动力费",{"key":19,"text":20,"correct":14},"C","税金",{"key":22,"text":23,"correct":24},"D","安装费",false,{"key":26,"text":27,"correct":14},"E","设计费","ABCE","安装费属于设备的直接成本，但是不属于设备本体的重置成本。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估实务一","会计财税",0]