[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-826432":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},826432,519,2,"多选题","使用剩余法评估待开发不动产时，需要合理估计开发建设期，开发建设期的确定方法主要有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","政府规定",true,{"key":16,"text":17,"correct":18},"B","根据之前所评估不动产的开发建设期确定",false,{"key":20,"text":21,"correct":14},"C","根据市场同类开发项目所需时间来确定",{"key":23,"text":24,"correct":18},"D","取其他所有待开发不动产开发建设期的平均值",{"key":26,"text":27,"correct":14},"E","开发商自己确定","ACE","剩余法下，开发建设期多为政府规定，有的由开发商自己确定。若不能从上两方面得到，则根据市场同类开发项目所需时间来确定。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估实务一","会计财税",0]