[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-825919":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},825919,519,2,"多选题","（2018年真题）企业生产线减值测试评估中，确定资产预计未来现金流量现值时，资本性支出预测通常包括（ ） 。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","扩张性资本支出",false,{"key":16,"text":17,"correct":18},"B","维护性资本支出",true,{"key":20,"text":21,"correct":18},"C","开发中相关无形资产后续必要支出",{"key":23,"text":24,"correct":18},"D","完成相关的在建工程必要支出",{"key":26,"text":27,"correct":14},"E","改良性资本支出","BCD","预测的资本性支出应该包括维护资产正常运转或者资产正常产出水平而必要的支出，或者属于资产简单维护下的支出，即维护性资本支出；完成在建工程和开发过程中的无形资产等的必要支出。",{"id":6,"name":31,"category":32,"favorite":33},"资产评估实务一","会计财税",0]